Planning application
The project Planning Application was submitted to Carlow County Council on the 16th January 2021. Following the validation process, certain documents have been re-submitted on the 22nd January 2021 and these are marked below with a *.
Coillte Renewable Energy has submitted an appeal to An Bord Pleanála in relation to the planning decision for the proposed Croaghaun Wind Farm. All documentation is presented below.
Planning Application Documents
An Bord Pleanála Appeal Documentation
Planning Documents
Planning Drawings
Environmental Impact Assessment Documents
Volume 1 - Non Technical Summary
Volume 2 - Main EIAR
Volume 3 - Appendices
Appendix 1.1: Curricula Vitae of EIAR Contributors
Appendix 1.2: Projects Considered in the Cumulative Assessment
Appendix 3.1: Construction and Environmental Management Plan
Appendix 3.2: Schedule of Environmental Commitments and Mitigation Measures
Appendix 3.3: Environmental Assessment of Replanting Lands at Crag, Co. Limerick
Appendix 3.4: Environmental Assessment of Replanting Lands at Sroove, Co. Sligo
Appendix 5.1: Scoping Responses
Appendix 5.2: Scoping Report
Appendix 5.3: Public Consultation Literature
Appendix 6.1: Carbon Calculations
Appendix 7.1: Baseline Noise Measurements
Appendix 7.2: Equipment Calibration Certificates
Appendix 7.3: Noise Sensitive Location Details
Appendix 7.4: Sound Power Level Data for Wind Turbines
Appendix 7.5: Valley Correction
Appendix 7.6: Predicted Noise Levels from Croaghaun Wind Farm at Nearby Noise Sensitive Locations
Appendix 7.7: Predicted Cumulative Noise Levels from Croaghaun Wind Farm and Greenoge Wind Farm at Nearby Noise Sensitive Locations
Appendix 7.8: Predicted Cumulative Noise Levels from Croaghaun Wind Farm and Greenoge Wind Farm with Mitigation at Nearby Noise Sensitive Locations
Appendix 8.1: NIS
Appendix 8.2: Bird Survey Reports
Appendix 8.3: Aquatic Survey Reports
Appendix 8.4: Bat Survey Reports
Appendix 8.5: Invasive Species Management Plan
Appendix 8.6: Assessment of Replant Lands Report
Appendix 8.7: Collision Risk Model Report
Appendix 9.1: Geotechnical Assessment Report
Appendix 10.1: Recorded Water Quality Monitoring Data
Appendix 10.2: Photographs of Existing Hydrological Features
Appendix 10.3: Assessment of the TDR – PO143
Appendix 12-1: Shadow Flicker Modelling Input Data
Appendix 12-2: Theoretical Shadow Flicker Times
Appendix 12-3: Total Theoretical Shadow Times per Receptor
Appendix 13-1: Turbine Delivery Route Survey Report
Appendix 13-2: Bridge Survey Report
Appendix 13-3: Consultation Response
Appendix 14.1: Figures
Appendix 14.2: Plates
Appendix 15.1: Viewpoint Assessments
Appendix 15.2: A1 Mapping
Appendix 16.1: Example of Consultation Letter